Critical Path Method with Fuzzy Activity Times
Loading...

Date
2022
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Open Access Color
OpenAIRE Downloads
OpenAIRE Views
Abstract
The Critical Path Method (CPM) is very useful in planning and controlling complex projects when their activity times are known precisely. However, in real-life applications, the durations are foreseen in the planning phase of the project; when it is put into practice, it may vary due to various reasons such as machine breakdowns, human factors, and disruptions in material supply. Accordingly, due to the uncertainty and difficulties in estimating operating times, CPM may not be able to accurately and fully represent real projects. From this point of view, in this study, it is aimed to perform critical path analysis in a project network whose activity durations consist of triangular fuzzy numbers. In the first stage, critical path analysis and project completion time were found by using possible, optimistic and pessimistic values. Then, Yager’s ranking method was used to ranking the fuzzy numbers and the project completion time and critical path were calculated with the crisp values obtained. The results were evaluated by comparing and the importance of using fuzzy numbers instead of crisp numbers in the CPM method was revealed.
Description
Keywords
Bilgisayar Bilimleri, Yazılım Mühendisliği, Matematik, İşletme
Fields of Science
Citation
WoS Q
N/A
Scopus Q
N/A
Source
Journal of Scientific Reports-A (Online)
Volume
Issue
51
Start Page
371
End Page
383