Optimization Based Control of Overcurrent Relays in Distribution Network Considering Real-Time Measurements: A Case Study

dc.contributor.author Unluturk, Ali
dc.contributor.author Ozer, Ishak
dc.date.accessioned 2026-03-26T15:01:08Z
dc.date.available 2026-03-26T15:01:08Z
dc.date.issued 2025
dc.description Özer, İshak/0009-0009-2992-3144; en_US
dc.description.abstract The coordination time interval (CTI) is very important in the coordination of overcurrent relays (OCRs). Although the CTI constraint is usually taken as 0.2 in the literature, it is also stated that it can be taken at different values. In the relay coordination carried out on a real power system serving in Erzurum/Turkey, the triping delay times (TDT) of OCRs and the contact opening delay times (CODT) of circuit breakers (CB) were measured and the CTI constraints in the coordination were determined according to the obtained measurements. This coordination process was transformed into an objective function (OF). This OF was solved with metaheuristic optimization algorithms. The Dandelion Optimization (DO) solution is better than spider wasp, golden jackal, zebra and dingo based optimization. Then, time multiplier setting (TMS) values are obtained from OF according to the CTI value determined according to the proposed real-time measurement and the CTI = 0.2 value frequently preferred in the literature. The performance of the relay TMS values obtained according to the proposed and classical methods was compared. Considering the power model and solution, 18.67% improvement in the operation times of the relays was achieved in Relay 2, 11.67% in Relay 3, 19.94% in Relay 4, 28.6% in Relay 6 and 23.31 % in Relay 7. The TMS value of Relay 5 is the same for the proposed and the classical method. As a result, the fast operation, reliability and selectivity of the power system were improved by ensuring correct relay coordination with the proposed method. en_US
dc.description.sponsorship We would like to thank the valuable management of ARAS Electricity Distribution Joint Stock Company, which provided us with legal per-missions to use the relay coordination data and necessary devices of the distribution network. en_US
dc.identifier.doi 10.1016/j.apenergy.2024.124439
dc.identifier.issn 0306-2619
dc.identifier.issn 1872-9118
dc.identifier.scopus 2-s2.0-85203801221
dc.identifier.uri https://doi.org/10.1016/j.apenergy.2024.124439
dc.identifier.uri https://hdl.handle.net/20.500.14901/3346
dc.language.iso en en_US
dc.publisher Elsevier Sci Ltd en_US
dc.relation.ispartof Applied Energy en_US
dc.rights info:eu-repo/semantics/closedAccess en_US
dc.subject Overcurrent Relay Coordination en_US
dc.subject Electricity Distribution Network en_US
dc.subject Metaheuristic Optimization Methods en_US
dc.subject Power System Measurements en_US
dc.title Optimization Based Control of Overcurrent Relays in Distribution Network Considering Real-Time Measurements: A Case Study en_US
dc.type Article en_US
dspace.entity.type Publication
gdc.author.id Özer, İshak/0009-0009-2992-3144
gdc.author.scopusid 55972949100
gdc.author.scopusid 59325116000
gdc.author.wosid Özer, İshak/Lnp-5487-2024
gdc.author.wosid Unluturk, Ali/Mzs-2650-2025
gdc.description.department Erzurum Technical University en_US
gdc.description.departmenttemp [Unluturk, Ali; Ozer, Ishak] Erzurum Tech Univ, Dept Elect & Elect Engn, TR-25100 Erzurum, Turkiye; [Ozer, Ishak] ARAS Elect Distribut Inc Co, Relay Measurement Test Unit, TR-25100 Erzurum, Turkiye en_US
gdc.description.publicationcategory Makale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı en_US
gdc.description.scopusquality Q1
gdc.description.volume 377 en_US
gdc.description.woscitationindex Science Citation Index Expanded
gdc.description.wosquality Q1
gdc.identifier.wos WOS:001317669400001
gdc.index.type Scopus
gdc.virtual.author Ünlütürk, Ali
relation.isAuthorOfPublication d770a909-ff20-429b-a818-e33b62ef8228
relation.isAuthorOfPublication.latestForDiscovery d770a909-ff20-429b-a818-e33b62ef8228

Files